KAP : EREGLI DEMIR VE CELIK FABRIKALARI T.A.S. / EREGL [] OZEL DURUM ACIKLAMASI (GENEL) 13.07.2015 08:24:24

13.07.2015 08:24
KAP : EREGLI DEMIR VE CELIK FABRIKALARI T.A.S. / EREGL [] OZEL DURUM ACIKLAMASI (GENEL) 13.07.2015 08:24:24



BU HABERIN KAP `IN SITESINDEKI ORJINAL HALI VE EKLI DOSYALARINI GOREBILMEK ICIN ASAGIDAKI LINK`I TIKLAYINIZ!
HTTP://WWW.KAP.GOV.TR/YAY/BILDIRIM/BILDIRIM.ASPX?ID=451755

KAP : EREGLI DEMIR VE CELIK FABRIKALARI T.A.S. / EREGL [] OZEL DURUM ACIKLAMASI (GENEL) 13.07.2015 08:24:24

OZEL DURUM ACIKLAMASI (GENEL)
---------------------------------------------------------------------------------------------


ORTAKLIGIN ADRESI : BARBAROS MAHALLESI ARDIC SOK. NO:6 34746 ATASEHIR / ISTANBUL
TELEFON VE FAKS NUMARASI : 0-216-578 80 61/ 0-216-469 48 06
E-POSTA ADRESI : ERDEMIR_IR@ERDEMIR.COM.TR
ORTAKLIGIN YATIRIMCI/PAY SAHIPLERI ILE ILISKILER BIRIMININ TELEFON VE FAKS NUMARASI : 0-216-578 80 61/ 0-216-469 48 06
YAPILAN ACIKLAMA ERTELENMIS ACIKLAMA MI? : HAYIR
OZET BILGI : 2. GALVANIZLEME HATTI YATIRIMI HK.


---------------------------------------------------------------------------------------------
SIRKETIMIZIN HALI HAZIRDA SOGUK HADDELEME ALT YAPISI BULUNAN EREGLI TESISLERI`NE, 2. GALVANIZLEME HATTI YAPILMASI ICIN MITSUBISHI-SIEMENS ORTAKLIGI OLAN PRIMETALS TECHNOLOGIES FRANCE SAS FIRMASIYLA ANLASMA IMZALANMISTIR.

KURULACAK OLAN YENI TESIS, MEVCUT GALVANIZLEME URETIM KAPASITESINE 350.000 TON/YIL KAPASITE EKLEYECEK OLUP, YATIRIMIN TOPLAM BEDELI YAKLASIK 120 MILYON USD OLACAKTIR. 2. GALVANIZLEME HATTI, SOZLESMENIN YURURLUGE GIRMESINDEN 29 AY SONRA TICARI URETIME BASLAYACAKTIR.

*ACIKLAMANIN INGILIZCE VERSIYONUNA ASAGIDA YER VERILMEKTEDIR./ ENGLISH VERSION OF THE DISCLOSURE IS STATED BELOW.

OUR COMPANY HAS SIGNED AN AGREEMENT WITH PRIMETALS TECHNOLOGIES FRANCE SAS, A JOINT VENTURE BETWEEN MITSUBISHI AND SIEMENS, FOR BUILDING THE 2ND GALVANIZING LINE WHICH WILL BE AN ADDITION TO OUR CURRENT COLD ROLLING SUBSTRUCTURE IN OUR EREGLI PLANTS.

THE NEW PLANT WILL ADD 350.000 TONS/YEAR TO OUR CURRENT GALVANIZING PRODUCTION CAPACITY AND THE TOTAL COST OF THIS INVESTMENT WILL BE APPROXIMATELY 120 MILLION USD. THE 2ND GALVANIZING LINE WILL COMMENCE COMMERCIAL PRODUCTION 29 MONTHS AFTER THE DATE OF ENTRY INTO FORCE OF THE AGREEMENT.

IN CONTRADICTION BETWEEN THE TURKISH AND ENGLISH VERSIONS OF THIS PUBLIC DISCLOSURE, THE TURKISH VERSION SHALL PREVAIL.

---------------------------------------------------------------------------------------------




'
18:0510.267
Değişim :  -0,10% |  -9,79
Açılış :  10.282  
Önceki Kapanış :  10.277  
En Düşük
10.202
En Yüksek
10.326
imkb grafik
BIST En Aktif Hisseler18:05
VAKKO 100,10 79.417.839 % 10,00  
KLNMA 19,03 14.344.918 % 10,00  
ORMA 286,00 8.205.384 % 10,00  
KTLEV 192,50 286.164.615 % 10,00  
ATATP 158,50 342.631.427 % 9,99  
18:05 Alış Satış %  
Dolar 32,2372 32,2449 % -0,29  
Euro 34,7092 34,7928 % -0,05  
Sterlin 40,1495 40,3507 % -0,47  
Frank 35,2638 35,4406 % -0,74  
Riyal 8,5225 8,5652 % -0,60  
18:05 Alış Satış %  
Gümüş ONS 27,44 27,47 % 0,66  
Platin 957,18 959,26 % 0,66  
Paladyum 976,46 981,22 % 0,66  
Brent Pet. 83,39 83,39 % 0,66  
Altın Ons 2.325,00 2.325,20 % 0,66